The Government of Canada spent an estimated $3.5M in 2021-2022 on contracts with Eastpoint Engineering.
Across 135 contracts active since the start of the 2017-2018 fiscal year, 56 have at least one amendment (41%). Of contracts with amendments, the average increase in dollar value was 98% and the average number of amendments was 1.54. Cumulatively these amendments represent an increase of $2.1M over the original contract values.
The average contract duration was 1.1 years, and the average contract value (not including contracts under $10k) was $117.6K. The longest contract was 4.21 years. The largest contract by value (including amendments) was $2.4M.
- EastPoint Engineering Limited
- EASTPOINT ENGINEERING LTD
- EASTPOINT ENGINEERING LTD.
- Eastpoint Engineering
- EastPoint Engineering Ltd
- Eastpoint Engineering Limited
- EastPoint Engineering
- East Point Engineering Limited
- East Point Engineering Ltd
- EAST POINT ENGINEERING LIMITED
- EastPoint Engineering Ltd.
- Eastpoint Engineering Ltd
- EASTPOINT ENGINEERING LIMITED
- EastPoint Engineering Limited
- EastPoint Enginerring Ltd
- East Point Engineering LTD
- EAST POINT ENGINEERING LTD